How To Install Selkirk Chimney Support
![Pin On Home Improvement](https://i.pinimg.com/originals/1c/9e/c8/1c9ec838aa6475db14034868f584d1f4.png)
Simply join the halves around the chimney fig.
How to install selkirk chimney support. Installation procedures the decorator ceiling support will support up to 40 ft. Rafter radiation shield installation roof support installation roof flashing installation roof guy installation maintenance and cleaning of chimney chart 1 offset chimney installation chart 2 chimney height above the roof chart 3 connector pipe clearances cathedral support replacement parts list installation record product registration. Transitioning from single wall black stove pipe to insulated double wall class. Please click here for product and technical assistance or a handy rep locator.
Offset support or an interior resupport. Approval of this factory built chim ney is based on the use of parts supplied by selkirk metalbestos and installation in accordance with these instructions. Selkirk also manufactures ceiling. Apply a bead of silicone caulk to seal the joint between the storm collar and the chimney fig.
13 m of chimney sections all of which must be installed above the support. Frame on all 4 sides a level square opening. See figures 2 3 and 4. Install the support immediately above the offset or at 9 14 m 30 intervals.
Figures 5 6 show the 2 most common types of decorator ceiling support installation. Then place the collar over the shield fig. To keep attic insulation away from the chimney install the two piece metal insulation shield. The chimney penetrates a roof.